Exe Estuary trail bridge pieces floated into place

Exe Cycle trail bridge The bridge sections are being floated on pontoons to the site, alongside a railway bridge

Pieces of a prefabricated bridge are being floated into place near Exeter as part of a cycle and walking trail.

Six sections, manufactured in Nottingham, make up the bridge, which is being erected as part of the Exe Estuary Trail.

Sections are being brought down the M5, bolted together at Exeter Quay and then floated on pontoons to the site, over the River Clyst at Topsham.

The bridge work, costing £1.7m, will be completed within a few weeks.

The pieces are to be jacked into position using hydraulics, project managers said.

When completed, the trail will be about 26 miles (42km) long, linking Exmouth, Exeter and Dawlish.

It is being developed and constructed by Devon County Council as part of the National Cycle Network Route 2.

More on This Story

The BBC is not responsible for the content of external Internet sites

BBC Devon

Weather

Plymouth

Min. Night 16 °C

Features & Analysis

Elsewhere on the BBC

  • Child museumChild's play

    Should children be allowed to run wild in museums? BBC Culture investigates

Programmes

  • Going through ice across the Northwest PassageThe Travel Show Watch

    Navigating the treacherous Northwest Passage through ice and Arctic storms

BBC © 2014 The BBC is not responsible for the content of external sites. Read more.

This page is best viewed in an up-to-date web browser with style sheets (CSS) enabled. While you will be able to view the content of this page in your current browser, you will not be able to get the full visual experience. Please consider upgrading your browser software or enabling style sheets (CSS) if you are able to do so.